jazyk / language:   ČJ EN



Specialized Conference


 

Electricity Supply System

.

in the CR 2011


development, reconstruction, maintenance, monitoring

and diagnostics of networks and VHV, HV and MV stations


Afternoon "smart session":

Energy accumulation, Virtual Power Plant, AMM





9 June 2011, Conference centre Tower, Hvězdova 1716/2b, Prague 4 - Pankrác

Conference language:
Czech, English

Conference moderator: Zuzana Šolcová,
Executive Director, AEM




8
.15 am Registration

9.00 am Opening of the conference


Current issues of reconstruction and development of the transmission system
Svatopluk Vnouček, Director of Asset Management, ČEPS, a s.

 

Development of the transmission system until 2023

Andrew Gayo Kasembe, Head of Development Department,

ČEPS, a.s. 

 

Process of ČEPS activities preparation and implementation in terms of ambitious investment program

Miroslav Prokeš, Director of Investment Project Management,

ČEPS, a.s.

10.30 am Coffee break

 

Transmission system recovery

Jiří Hrbek, Head of Asset and Documentation Management,

ČEPS, a.s. 

 

Functionalities of the HV asset conditions central monitoring system in CEPS (ACM) - monitoring of lightning activities (EUCLID)

Dagmar Kopejtková, Head of Standardization Department, 

ČEPS, a. s.

 

Development of the transmission system commercial measuring
Tomáš Martinec, Head of Commercial Measuring Department, ČEPS, a. s.

 
12.00 am Lunch

1.00 pm Beginning of afternoon session

Development of distribution system, renovation cost
controlling and expansion of the DS

Václav Kropáček, Head of Network Development,
ČEZ Distribution, a. s.


Maintenance and repair of distribution system
Representative
, ČEZ Distribution Services *


Smart Grids, Electromobility, Virtual Power Plant, Smart Metering, Energy accumulation

Representative, ČEZ Measurement*
Martin Machek
, ČEZ, a. s.
Jan Baláč
, LEEF TECHNOLOGIES
Igor Zahrádka
, Director, B:TECH
Jiří Roubal, ABB

And others


5.00 pm Conference conclusion, cocktail

 

Conference objectives

  • to identify suppliers opportunities

Target group
  • suppliers (building contractors, technology suppliers, design companies, etc.)

Conference topics

  • planned development, maintenance and reconstruction of the transmission system
  • monitoring and diagnostics of the transmission system
  • activities preparation a implementation process  
  • planned development, maintenance and renovation of the distribution network (the plan of construction, reconstruction)
  • amount of invested funds over the period 2011-2020
  • new suppliers, expanding the suppliers portfolio
  • how to become a supplier?
  • technical specifications for suppliers

          and more

 

    Partners
  ČEPS

B:TECh

Schneider Electric

ABB

  Media partners
  All for POWER

KONSTRUKCE Media